HONGYANG GROUP Guinea-Bissau Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Guinea-Bissau Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

D-GA44 FUEL DISPENSER

D-GA44

D-GA44 FUEL DISPENSER

Pump Type: Optional

Inlet Pressure : >=54kPa.

Flow rate (L/min.) :55±5

Suction Distance (m): 6(verticalmente) / 50(orizzontalmente)

FlowMeter Type: Optional

Accuracy :±0.2%

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition : -40~~+55degree

Control Type: Solenold Vale Control Type

Preset : Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price: 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Totalizer :1~~9,999,999

Hose :4.5m

Weight : 335kg

Dimension(L×W×H): 1270 x 620 x 2420(mm)

Dimension(L×W×H)Of Qty of Container: 40ft: 45 20ft: 22

products links

links

technical archives

    fuel dispenser where air being exhausted out and oil being left. When oil level reaching a certain height, oil is controlled by floater and returned low pressure chamber. The inlet and outlet pressure disappear after fuel dispenser stopping work, check valve is closed controlled by spring. Thereby the upper oil of check valve can’t flow into high pressure chamber. Meanwhile, the taper valve on floater plug the hole at check valve seat, check valve also shut down under spring function. Under normal working situation of vapor separator, the oil flowed into separate chamber and returned back low pressure chamber should have an equivalent volume so as to ensure the normal working of vapor separator. If the former oil volume is lower than that of latter, the exhausting pipe would flow out oil. If the oil volume in separate chamber is less than the discharge of check valve, check valve would be opened or closed, so th fuel dispenser at the accuracy of fuel dispenser will be affected due to pump’s fluctuation. If install check valve, the separate function don’t be affected, reducing flow resistance. If don’t mount fuel dispenser check valve , However, returned oil would flow out exhausting pipe after stopping fuel dispenser, and appear cavitation in the down stream of vapor separator and pipeline so that affect next measure accuracy. Therefore, mounting a check valve is necessary to fuel dispenser’s normal operation. Some training books call check valve as outlet valve, but in this manual adapts check valve for facilitating understand. Check valve plays role to release the suddenly high pressure so as to protect hydraulic system. 3. Maintenance and troubleshooting Regularly cleaning filter is principal sector of maintenance during operation. New filling station always full of dirty and waste in tank and pipeline, thus, the normal operation of fuel dispensers are affected. Thus, paying much attention to check and clean of filter. As the manufacturers made this kind of vapor separator are many, the processing method and product understanding to

technical specification

    fuel dispenser ement Contents   Data_El   cation cation - the contents of the last application data element   dependent dependent which shall be written to the specified database   1   For data longer than 254 bytes the Data_Lg will have the value 255 and the 2 following bytes   indicate the data length   The data elements the recipient receives (in one message or in different messages)   must be processed sequentially. That means that all parameter used by a command   must be written before the command is transmitted (in the same message or the   previous one).  3.3.4 Acknowledge - Message  The general format for an ACKNOWLEDGE message is given in the table below: Examples  are given in Chapter 5.2.2:   Message Field Field Type fuel dispenser Value Description  FP2_1.90 IFSF STANDARD FORECOURT PROTOCOL February 2006   fuel dispenser COMMUNICATION SPECIFICATION   Page: 20   bin8 1 to 255   LNAR S   Logical Node Address Recipient   bin8 1 to 127   N   bin8 1 to 255   LNAO S   Logical Node Address Originator   bin8 1 to 127   N   bin8 0 Message Code   IFSF_MC   The IFSF_MC is 0 for application messages   bin8 111xxxxx Message Status   M_St   (bit map)

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    fuel dispenser taly and 14% in Japan. Even in still growing America, the imminent retirement of the baby-boomers means that companies will lose large numbers of experienced workers in a short space of time (by one count half the top people at America s 500 leading companies will go in the next five years). Meanwhile, two things are making it much harder for companies to adjust. The first is the collapse of loyalty. Companies happily chopped out layers of managers during the 1990s; now people are likely to repay them by moving to the highest bidder. The second is the mismatch between what schools are producing and what companies need. In most Western countries schools are churning out too few scientists and engineers—and far too many people who lack the skills to work in a modern economy (that s why there are talent shortages at the top alongside structural unemployment for the low-skilled). What abo fuel dispenser ut all those billions of people in the developing world? Alas, adding willing hands to the global economy is not the same as adding trained brains. Both India and China are suffering fr fuel dispenser om acute skills shortages at the more sophisticated end of their economies. Wage inflation in Bangalore is close to 20%, and job turnover is double that (“Trespassers will be recruited�reads a sign in one office). The few elite institutions, such as India s Institutes of Technology, cannot meet demand. And there are also cultural legacies to deal with India s Licence Raj destroyed management skills, while China s Confucian tradition still emphasises “face�over innovation. A problem for all of us This poses different challenges for companies, governments and individuals. For companies the main task is simply to end up with more talented people than their competitors. Firms will surely have to cast their net wider, employing more part-time workers and more older workers, and spending yet more on training, even in places where workers seem cheap the training budget at Infosys, an Indian tech giant, is now w